This building has now been ready for about 2 years.
The building must have been painted with the cheapest _interior_ paint they could possibly find or they have slaughtered 30-40 sheep up in top to put rust-like stains along all sides of the concrete slab.
Currently there are 15-20 units unsold still being held by the developer.
Warranties are dealt with in the slowest and most disgusting manner as possible.
Deposits are illegally being held on many other stalled projects.


LinkBack URL
About LinkBacks
Reply With Quote

Bookmarks